PerMix is here to listen to your needs and provide sustainable solutions.Please fill out the form below, and we'll get in touch with you shortly.
Date
Company
Contact
Title
Address
City
St
Zip
Country
Phone
Mobile
Fax
Email
Type of Mixer & Size
How is this method performing?
Product is :
Dry
Wet
Paste
Mastic Compound
by Volume
ft3 or liters per
hour(s)
Or
by Weight
lbs. orkgs. per
Name(s)
Bulk Density (lowest/min.)
lbs./ft3g/cc
Bulk Density (tapped/max.)
Other Characteristics:
Friable
Dusty
Cohesive
Abrasive
Agglomerates
Hygroscopic
Oxidizies
Viscosity
cps @
°F /°C
Rheology :
Thixotropix
Pseudoplastic
Dilatent
Newtonian
Particle Size Distribution :
meshu microns
% less than
atmospheric pressure
Vacuum
"Hg
Pressure
psig
Incoming product
During Mixing
After Mixing
Are liquids added during the process?
YesNo
Liquid Viscosity
Quantity
usg /liters
Rate of Addition
gpm /lpm
Required for heating to
Required for cooling to
Medium :
water
steam
hot oil
Jacket Rating :
14.7 psig non-code
ASME / PED / ATEX code stamped for
psign/bar
free-flowing powder that can be bottom discharged.
free-flowing liquid or paste that can be bottom discharged.
non-free flowing powder that mist be dumped.
solid, mastic or compound that will be dumped.
solid, mastic or compound that will be extruded with a screw.
Clearance below discharge
Height/Ceiling restrictions
304 ,
316
316L Stainless Steel
Other Alloy
Coating
Mild Steel
304
Other
Internal :
mill,
2B,
#4,
bead blast,
grit
Ra(u inch)
External :
External Structural:
coated,
other
Electrical
voltage,
phase,
Hz
"Hg,"
cfm
Air
psig,
Water
gpm,
Steam
lbs./hour
Will mixer and controls be in different areas?
Mother Classification :
non-classified TDFC
Class :
Cls. l(gas/vapor),
Cls. ll (dust)
Division:
Div.1 (Class substance is present in normal conditions)
Div.2 (Class substance is present in abnormal conditions)
Electrical Enclosures :
NEMA-12,
NEMA-4(washdown),
NEMA-4X (washdown & corrosive),
NEMA-7&9 (XP)
NEMA-4,7&9,
Vacuum System
Heating
Liquid Addition
Linert Gas Purge
Loading/Unloading
Solvent Recovery
Cooling
Lump Breaker
Solids Sampler
Controls
Start-Up Scheduled for :
1st
2nd
3rd
4th Qtr.,
20
Is Project Funded :
Installation Location (State or Country) :
Stay Connected